| This allows for ease of placement in
removing the basin from the shipping pallet to the final
installation location. The directions for this are
explicit:
The stainless steel threaded embed with a forged
lifting eye is included to lift off pallet and place
on site. Do not lift over 6" or
for a period longer than 5 minutes with lifting eye
unless specifically instructed in writing by STONEWEAR.
In other words the embed is not intended to be used as
a primary lifting point as seen in the photo where half
of a sixteen foot Quatrefoil basin is being lifted over a
five story complex to an interior courtyard.
The videos are even more impressive to illustrate the
strength of STONEWEAR
composites because there were wind gusts in excess of 30
mph " at altitude", causing the whole load to
bounce around like a kite.
|